OBJECTIVE of PQ for Blender

To determine that the PQ for Blender perform as intended by repeatedly running the system on its intended schedules and recording all relevant information and data. Results must demonstrate that performance consistently meets pre-determined specifications under normal condition, and where appropriate the worst case situations.

TABLE OF CONTENT

PARTICULARSPAGE NO.
Title page 
Table of contents 
Objective 
Scope 
Re-Qualification Schedule 
Location of equipment 
Validation team & Responsibility 
Pre-approval of documents 
Scope of supply 
Brief Process Description 
Re-Performance Qualification Procedure 
Performance Verification 
Re-Performance Qualification Report 
References 
Result 
Deviation 
Summary 
Conclusion 
Recommendations 
Attachments 
Post approval of document 

SCOPE

To be performed after installation, modification or relocation and for the re-performance at appropriate interval or as per re-qualification planner.

Performance of the blender machine shall be documented for future reference.

Assure that the blender machine performance is adequate to support the process for which the system is intended

RE_QUALIFICATION SCHEDULE

Frequency

Performance check of the machine should be re-qualify after every 5 years  ±2 months

LOCATION OF EQUIPMENT

The location of the equipment is in granulation room.

Name of EquipmentID No.Room NameSection
blender Granulation 

VALIDATION TEAM AND RESPONSIBILITY

DepartmentResponsibility
Productionv  Preparation of protocol and compilation of report. v  Review of protocol and report. v  Execution of Re-Qualification activities as per the protocol. v  Responsible for the compliance of  Re-qualification data
Engineeringv  Review of protocol and report. v  To assist user/concerned department during Re- qualification activity
Quality Controlv  Review of protocol and report. v  Responsible for analysis of samples & evaluations of the test results.
Quality Assurancev  Review, approval and certification of the protocol / reports. v  Execution & approved of re-qualification activities as per the protocol & certification after successful re-qualification of the equipment.

PRE APPROVAL OF DOCUMENTS

Prepared by

DesignationNameDateSignature
Executive/Officer Production   

Checked By

DesignationNameDateSignature
Head Engineering   
Head Production   
Head Quality Control   

Approved by

DesignationNameDateSignature
Head QA   

Scope Of Supply:

DescriptionSpecification
Model  GMP Model
External dimension:-
  Accessories  Lid/cover both end
Gear box cover
  Control system440 volts, three phase power supply

Brief Process Description:

The Blender is an efficient and versatile blending machine for mixing and lubrication process of dry granules equally. It can be used for pharmaceutical, food, chemical and cosmetic products etc. double cone Blender consists of cone shaped body, rectangular central portion and top and bottom polygonal frustum. It is provided with baffles for fast and efficient mixing, charging port and outlet with butterfly valve. It is very useful machinery for pharmaceutical industry where in gentle blending of dry granules or powder is to be done. Other important feature of this machine is easy to clean in place. The bin charging system can also be incorporated in it which is a dust free closed system for charging and discharging of powders or granules. The powder consumption is comparatively lower than the other similar type of blender.

  • Two third of the volume of the cone blender is filled to ensure proper mixing.
  • Machine rated for continuous operation
  • Higher output with process uniformity.
  • All contact parts of SS 316 AISI.
  • All contact parts can easily be dismantled and cleaned for change of product.
  • Technical Details:
  • Outside controls
  • Design as per stringent cGMP requirements.
  • All Contact parts of AISI Stainless Steel 316 Quality
  • All Non contact parts of AISI Stainless Steel 304 Quality
  • Silicon Food Grade seal/ gasket
  • Easy mobility
  • Easy to clean all contact parts

Read this also :- URS of Blender

PQ for Blender PROCEDURE

  • The action of repeating the qualification or reconfirming that process, product or equipment is suitable for a particular position or task Availability of product for operate with load was checked.
  • The power supply and connected utility was checked before starting performance qualification.
  • The operating functions of control panel switches and buttons were checked.

PERFORMANCE VERIFICATION

Objective of this performance verification is to provide documented evidence that equipment perform as per respective and up to its operating & performance range

Standard Operating Parameters Verification

Objective of this verification is to provide documented evidence that equipment perform satisfactory as per its standard operating procedure.

Cleaning check:

Check pointsObservationChecked By (Sign & Date)
Check the cleanliness of the blender cone.  
Check the cleanliness of the cone lid and its gasket.  
Check cleanliness of the electrical panel inside and outside.  
Check the cleanliness of gasket and clamp.  
Check the cleanliness of External body of the blender.  

Safety precaution while blending process of material:-

 Mask and gloves should be wearing during blending process.

Performance check of the machine/equipment:-

TestAcceptance CriteriaObservationsDone By Sign/DateChecked By Sign/Date
  Check the machine for proper placement.  Machine  should be place in adequate space & there should be enough space   
  Check the machine for abnormal vibration during blending of material.  Machine vibration should not be abnormal.   
  Check the proper locking of lid with gasket to avoid spillage.  Lid should be properly locked with gasket & locking mechanism & there should be no leakages or spillage.   
Check the smooth movement of the blender.Loaded blender should be move smoothly.   
Check the RPM of the machine.  Machine RPM should be as per set RPM.   

Test Method:

Operate the equipment as per Standard Operating Procedure SOP no.    for Operation & Cleaning of Double cone blender machine and record the performance of the machine.

Testing procedure:

For performance check of the blender machine, take any once batch   or products material and mix the material using blender on RPM as per the BMR  

Product NameBatch NumberObservationChecked ByReviewed By
                   

Record the preventive maintenance status of the machine/equipment.

Equipment NameI.D. No.SectionDetail of Preventive Maintenance
Done onDue on
     

Acceptance Criteria:

  • Equipment/ Machine shall be operating as defined in the standard operating procedure, if differ then record deviation & check the performance of machine.
  • RPM of the machine to be set as per the BMR for the product & mixing should be proper. Results after mixing should meet the active material claim.
  • Operation shall be smooth and there should not be any abnormal sound/ noise.

RE-PERFORMANCE QUALIFICATION REPORT for PQ for Blender:

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

REFERENCES:

SOP No.

RESULT:

_____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Checked By (Sign & date):________________

DEVIATION/CHANGE CONTROL

____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Checked By (Sign & date):________________

SUMMARY:

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Written By (Sign & date):________________

CONCLUSION:

_______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Written By (Sign & date):________________

RECOMMENDATIONS

_______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

                                                                           Written By (Sign & date):________________

ATTACHMENTS:

         Document name   Reference No.Checked by Sign & Date
   

POST APPROVAL OF PQ for Blender DOCUMENTS

Prepared by

DesignationNameDateSignature
Executive/Officer Production   

Checked By

DesignationNameDateSignature
Head Engineering   
Head Production   
Head Quality Control   

Approved by

DesignationNameDateSignature