URS for Colloid Mill

OBJECTIVE of URS for Colloid Mill

The purpose of this document is to ensure that all the critical aspects of the Equipment, cGMP & Safety features have been considered in designing the equipment/instrument and is properly documented. The objective of URS for Colloid Mill is to provide the appropriate design, operational and performance requirements for procurement of equipment including major ancillary component or fabrication of the area so as to meet the in-house requirements as well as compliance with cGmP.

The User Requirement Specifications (URS) is written to support the prospective supplier to identify organization needs and propose a design to the organization.

CONTENTS

Sr. No.TitlePage No.
 APPROVAL
 OBJECTIVE
 RESPONSIBILITY
 EQUIPMENT DESCRIPTION & IDENTIFICATION
 USER REQUIREMENTS
 TECHNICAL DESCRIPTION
 COMPLEMENTARY ASPECTS
 SUPPLIER TECHNICAL DOCUMENTATION REQUIREMENTS
 SAFETY AND ENVIRONMENTAL PROTECTION
 CLEANING MAINTENANCE AND SERVICE
 SCOPE OF DELIVERY
 EXPECTED DOCUMENTATION
 MAINTANANCE REQUIREMENTS
 OTHER REQUIREMENT
 REFERENCE
 ABBREVIATIONS

APPROVAL of of URS for Colloid Mill:

 PREPARED BY:

DepartmentNameSignatureDate
Production (Officer/Executive)

 REVIEWED BY:

DepartmentNameSignatureDate
Production (Executive/Manager)
Quality Assurance (Executive/Manager)
Engineering (Executive/Manager)

APPROVED BY:

DepartmentNameSignatureDate
Quality Assurance (Head QA)

RESPONSIBILITY:

The User department comprising of representatives from each of the following departments should be responsible for the overall compliance with this URS:  

DepartmentResponsibility
User DepartmentPreparation of User Requirement Specifications (URS).Ensures that the document is in compliance with current policies and procedures of cGMP regulations. Ensures that the content is sufficient, clearly defined, technically sound and accurate. It is a Guidance document to prepare the URS.  
User/Project/EngineeringThe Department Head or Designee shall be responsible to review the URS.
Quality AssuranceThe Department Head or Designee shall be responsible to review and approve the URS.

EQUIPMENT DESCRIPTION & IDENTIFICATION:

SCOPE: 

  This document covers all aspects of Users requirements for the Equipment along with all Attachment,   Spare Parts, Change Parts and Accessories to be used in Colloid Mill 5 HP, at company The following item (s) intended for use as part of pharmaceutical manufacture.

  Scope incorporates understanding and documentation of critical requirements such as system requirements, cGMP requirements, safety requirements, documentation requirements and operational requirements.

PURPOSE:

Purpose of equipment is used in production area for mixing of Liquid of material used in formulation of solid dosages.

USER REQUIREMENTS of URS for Colloid Mill

SYSTEM COMPONENTSSYSTEM REQUIREMENTS
Identification (In case of  Equipment /Instrument)Details of Make, Name, Serial. No., Capacity, Model and Year of manufacture should be available
Model/TypeAs per cGMP model (Colloid Mill.)
Capacity5 HP  
Potential Suppliers  SAMS TECHNO MECH PVT. LTD.
Contact parts (In case of Equipment)SS316 with Mirror finish
Non contact parts (In case of  Equipment)SS304 with matt finish
Non metallic contact parts  (In case of Equipment /Instrument)Any material with food grade quality having no Potential impact on the products.Durable.Must be easily cleanable.
Motor & Electrical installations (In case of Equipment /Instrument)As per machine requirement
Machine assemblies (In case of  Equipment /Instrument)Must be covered with SS 316 with matt finish.
Machine adjustments (In case of  Equipment /Instrument)Setting with Zero clearance with good accuracy.
Packaging & TransportShould be packed and transported in such a way to avoid any damage during transportation.
No. of requirements01
Requirements for any power failure backup’s (In case of Equipment /Instrument)To be backed up by installed in-house DG set.

TECHNICAL DESCRIPTION:

SPECIFICATIONSYSTEM REQUIREMENTS
Colloid Mill  YES
Capacity 5 HP  YES
Dimension ( L-1070 mm W-475 mm, Ht-1310 mm)YES
Start Push ButtonYES
Stop Push ButtonYES
Phase (3 Phase)YES
Voltage (415 Volts)YES
Frequency (50 Hz)YES
Total HP (5 HP)YES
Total KW (3.7 kW)YES

COMPLEMENTARY ASPECTS

SpecificationSYSTEM REQUIREMENTS
The vendor Shall supply all available information for the adequate exploitation of equipment. For the Compliance of this purpose at the Job site and/ or at the Vendors Shop. Vendor’s technical staff shall train customer’s personnel. The scope of the Training will be agreed during the contract signature.YES
The supplier is to include the personnel training activities. The contractor is to specify the foreseen time for: Operator/Supervisor trainingManager TrainingElectrical maintenance trainingMechanical Maintenance trainingYES
The contractor is to specify the personnel background needed for each of the operators maintenance.YES

SUPPLIER TECHNICAL DOCUMENTATION REQUIREMENTS:

COMPONENTSREQUIREMENTS
Drawings Equipment/Systems electrical drawing.Point to point wiring diagramPre Installation Requirements will be supplied by Vendor
LIST. Equipment and instrument list with Component description.Electrical component parts list with Description.Function check list.Documentation list.Spare part listList of spares required for smooth operation will be provided by the Vendor at the time of ordering.

SAFETY AND ENVIRONMENTAL PROTECTION:

SpecificationRequirements
All motors have to be thermally Protected.YES
All the Installation must be in accordance with the cGMP.YES
The cGMP concerning safety must be applied.YES

CLEANING MAINTENANCE AND SERVICE:

Specification
In accordance with cGMP guidelines the units must be easy to clean, to disinfect, and where necessary, to sterilize.
The Supplier should guarantee that, if required, a service team can be on site within one working day.
The design should be such as to allow mechanical cleaning of the surface and that the cleanliness of the surface can be checked easily.
All machine parts, in particular instrumentation, should be constructed so that they can be easily removed and calibrated.
All special tools required for running and maintenance should be best.
A spare parts delivery guarantee with in time.

SCOPE OF DELIVERY:

SpecificationRequirements
Units described in the specific system requirements including all necessary controls and instrumentation.YES
The complete mechanical and electrical installation.YES
The Connections to all the necessary utilities, exhaust, and waste lines necessary for its operation.YES
All piping and cabling of the units itself.YES
Wiring and cable run: all wiring and cable run is part of the supply. We will supply the main power switches to be located in correspondence to the electrical and control cabinets delivered by the equipment supplier.YES
All internal contacts of the supplied equipment for the required utilities.YES
Unload on site of the equipment: the supplier is required to define all the  necessary handling devices required to the unloading operation. The supplier will inform at least 4 weeks in advance the day of delivery and the list of required handling devices.YES
Assembling operation: the required consumable, the internal transportation, the assembling tools and the required personal are part of   the supply.YES
A complete set of commissioning spare parts.YES

EXPECTED DOCUMENTATION of URS for Colloid Mill:

The Vendor shall provide documents needed for preliminary review of the equipment initially. Documents reflecting ‘as-built’ condition shall be provided along with the final consignment delivery. The following documents shall be provided by the suppliers during the procurement life cycle:

Document DetailsRequired (P / O )RequirementFormat
Design SpecificationsRShould Provide        Paper or PDF
Functional SpecificationsR
Piping and Instrumentation Diagram (P&ID)Q
Instrument ListingR
Control Panel Assembly DrawingsR
Machine Assembly DrawingsR
Bill of MaterialsR
Operator, Maintenance and Service ManualsR
Spare Parts ListR
MOC CertificatesR
Calibration Certificates of InstrumentsR
Test Certificates of Components/Test DevicesR
Weld Certificates (Optional)Q
‘As-built’ P&IDQ
GA DrawingR
Isometric DrawingQ
Electrical / Control Wiring DrawingsR
Component Cut Sheets (Optional)Q
PLC Program Printouts and Disk File (Optional)RElectronic Downloadable
HMI Configuration Printout and Disk File (Optional)R
Other (Specify) product contact surfaces areaRVendor DQ/IQ/OQStamp with Signed Hard Copy/Soft Copy

MAINTANANCE REQUIREMENTS:

(Accessibility for easy maintenance, equipment side to be kept open able to the service area for maintenance activity, required spares, etc. shall be mentioned in details).

Approved Operational and Preventive Maintenance SOP’s should be available.

OTHER REQUIREMENTS:

All Vendors Documents like DQ, IQ, OQ, Operation Manuals, Calibration Certificate and Components Certificates etc. shall be in English Language.

REFERENCE:

TitleDocument No.Location
ManualN.A.Validation Document Cell

ABBREVIATIONS:

AbbreviationsDescription
cGMPCurrent Good, Manufacturing Practice. 
URSUser Requirement Specification
0CDegree Centigrade
PLCProgrammable Logic Control
mmMillimeter
HMIHuman Machine Interface
VVoltage
HzHertz
MMIMan Machine Interface
RHRelative Humidity
NMTNot More Than
HVACHeating Ventilation and Air Conditioning
CFMCubic Feet per Minute
LODLoss of Drying
RPM Revolution Per Minute
MOCMaterial of Construction
GMPGood Manufacturing Practices
GAGeneral Assembly
P & IDPiping & Instrumentation Drawing
POPurchase Order
PDFPortable Document Format
SCADASupervisory Control And Data Acquisition
NLTNot Less Than
FATFactory Acceptance Test
DQDesign Qualification
IQInstallation Qualification
OQOperational Qualification
SOPStandard Operating Procedure
VFDVariable Frequency Drive
MCBMiniature Circuit Breaker
PLMPlanetary Mixer